Skip to main content

Case Study

Towerside, Wapping


project details

Client:
D & G Block Management Ltd
Overview:
  • ‘DOFF’ brick cleaning
  • Redecoration to balconies, railings, grilles, lamp columns, rainwater pipes etc.
  • Timber window surround repairs/renewal
  • Concrete window cill repairs/replacement
  • General brick repairs
  • Replacement of ventilation grilles
Project duration:
15 Weeks (2017)
Value:
£251,000

scope of works

Towerside is a residential block located within the London borough of Tower Hamlets and situated on Wapping High Street with one elevation facing the Thames. The block the subject of a redecoration and repair contract in July 2017.

TCL were appointed to carry out two phases of what would become a three phase programme of works. The first phase consisted of work to the Thames elevation of blocks 148 to 150 inclusive with phase 2 being work to the remaining part of the Thames elevation and access ways.

The final phase to the front elevation was under a separate instruction and was subject to satisfactory performance on the earlier phases and budgetary considerations.

Download PDF